A14 C2H – Planned road closures w/c 21 December

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Thursday 24 9pm to Sunday 27 5am (56 hours)
• B1514 Brampton Road between RingGo car park and Edison Bell Way

– Vehicles on the Huntingdon town centre side will be diverted onto the ring road, Ermine Street B1044 to Spittals roundabout, A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514.

– Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A1307 – Overnight works rescheduled for 17 December

Dear All

Unfortunately we had to cancel our white lining works last night on the A1307, however the work has now been re-scheduled for tomorrow, Thursday 17th. Please see below new timings for the closures of the A1307:

8pm – 9.30pm A1307 both directions between Dry Drayton roundabout and Girton roundabout /A14 westbound entry slip

9.30pm – 10.30pm Dry Drayton overbridge southbound between Oakington roundabout and Dry Drayton roundabout

10.30pm – 12am A1307 both directions between Bar Hill jug handle and Oakington roundabout

12am – 2am A1307 both directions between Buckingway roundabout and Bar Hill jug handle (Lolworth residents will be escorted to and from Buckingway roundabout)

Kind Regards

A14 Cambridge to Huntingdon improvement scheme
Highways England | Woodlands | Manton Lane | Bedford | MK41 7LW
Web: http://www.highwaysengland.co.uk

A1307 – Overnight works 14 – 15 December

Dear All

Next week, over 2 nights we will be undertaking white lining works along the A1307. We will be working across 4 stretches of the road on Monday 14th and Tuesday 15th. Please see below for details of locations, timings and the diversion routes.

Monday 14th

  •  9pm – 6am A1307 outbound from Girton College, Huntingdon Road to the first roundabout under the M11 roundabout (surfacing works)

Diversion via B1049 to Histon junction 32 and the A14

  • 8pm – 2am A1307 both directions between Dry Drayton roundabout and Girton roundabout /A14 westbound entry slip

Diversion via A14 to Bar Hill junction 25 for access to the A1307

  • 2am – 6am Dry Drayton overbridge southbound between Oakington roundabout and Dry Drayton roundabout

Diversion via A1307 to Bar Hill junction 25 and A14 to exit for A1307 at Girton junction 31

 

Tuesday 15th

  • 8pm – 11pm A1307 both directions between Buckingway roundabout, Swavesey and Bar Hill jug handle

Diversion via A14 between Swavesey junction 24 and Bar Hill junction 25. Lolworth residents will be escorted to and from Buckingway roundabout

 

  • 11pm – 5am A1307 both directions between Bar Hill jug handle and Oakington roundabout

Diversion via A1307 and A14 between Bar Hill junction 25 and Girton junction 31

 

Kind Regards

A14 Cambridge to Huntingdon improvement scheme
Highways England | Woodlands | Manton Lane | Bedford | MK41 7LW
Web: http://www.highwaysengland.co.uk

 

A14 C2H – Planned road closures w/c 14 December

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures
Monday 14 to Friday 18 (five nights)
• B1514 Brampton Road between Ring&Go car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, Ermine Street B1044 to Spittals roundabout, A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.
• Hinchingbrooke Park Road loop
Vehicles will be diverted via the temporary right turn onto Brampton Road

Monday 14 to Tuesday 15 (two nights)
• A1307 westbound between St Ives and Godmanchester
Vehicles will be diverted east on A1307 to Swavesey and onto the A14 westbound at junction 24, exit at Brampton Interchange junction 22 onto A1 northbound to Brampton Hut roundabout. From here, return south on the A1 and onto the A14 eastbound at Brampton Interchange and exit at junction 23 onto the A1198

Monday 14 (one night)
• A1307 outbound from Girton College, Huntingdon Road to the first roundabout under the M11 roundabout
Vehicles will be diverted via the B1049 to Histon junction 32 and the A14
• A1307 both directions between Dry Drayton roundabout and Girton roundabout /A14 westbound entry slip 8pm – 2am
Vehicles will be diverted via the A14 to Bar Hill junction 25 for access to the A1307 into Cambridge.
• Dry Drayton overbridge southbound between Oakington roundabout and Dry Drayton roundabout 2am – 6am
Vehicles will be diverted via A1307 to Bar Hill junction 25 and A14 to exit for A1307 at Girton junction 31

Tuesday 15 (one night)
• A1307 both directions between Buckingway roundabout, Swavesey and Bar Hill jug handle 8pm – 11pm
Vehicles will be diverted via the A14 between Swavesey junction 24 and Bar Hill junction 25. Lolworth residents will be escorted to and from Buckingway roundabout
• A1307 both directions between Bar Hill jug handle and Oakington roundabout 11pm – 5am
Vehicles will be diverted via the A1307 and A14 between Bar Hill junction 25 and Girton junction 31

Friday 18 (one night)
• A14 eastbound between Godmanchester junction 23 and Swavesey junction 24
Vehicles will be diverted onto A1198 northbound and A1307 eastbound to rejoin the A14 at Swavesey junction 24
• A14 westbound between Swavesey junction 24b and New Ellington junction 21
Vehicles will be diverted onto A1307 to Godmanchester, south on A1198, west on A428, and north on the A1 to re-join the A14 via Brampton Hut

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 7 December

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Monday 7 to Friday 11 (five nights)
• B1514 Brampton Road between Hinchingbrooke Park Road and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, Ermine Street B1044 to Spittals roundabout, A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.
• Hinchingbrooke Park Road between the loop and Brampton Road
Vehicles will be diverted via Hinchingbrooke Park Road loop onto B1514 Brampton Road. Access to Huntingdon will be via A141 to Spittals and onto Ermine Street B1044
• A1307 eastbound between Godmanchester and St Ives
Vehicles will be diverted south on A1198, east on A428 to join the A14. Continue to Histon junction 32 and return on A14 westbound for access to A1307 at Swavesey junction 24

Monday 7 to Tuesday 8 (two nights)
• A10 north and southbound from Milton junction 33 to Butt Lane
Vehicles wishing to travel north be diverted onto A14 westbound, exit at Histon junction 32, B1049 Bridge Road, Impington Lane, Burgoynes Road, Milton Road and Butt Lane to access the A10. Vehicles travelling south on the A10 will follow the above diversion route in reverse

Friday 11 (one night)
• A14 eastbound between New Ellington junction 21 and Swavesey junction 24
Vehicles will be diverted onto A141 to Brampton Hut roundabout, A1 southbound to Wyboston and then east on A428 to-rejoin the A14 at Girton junction 31
• A14 westbound between Swavesey junction 24b and New Ellington junction 21
Vehicles will be diverted onto A1307 to Godmanchester, south on A1198, west on A428, and north on the A1 to re-join the A14 via Brampton Hut

Friday 11 9pm – Monday 14 6am
• A14 westbound Brampton Interchange junction 22 exit slip (A14 westbound to A1 northbound free flow link)
Vehicles will be directed to continue on the A14 to Ellington junction 20, exit and return east on the A14 to Brampton Hut for access to the A1

Saturday 12 (one night) 9pm – 8am
• Brampton Road B1514 between station car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 30 November

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Monday 30 November to Saturday 5 December (six nights)
• B1514 Brampton Road between Hinchingbrooke Park Road and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, Ermine Street B1044 to Spittals roundabout, A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

Monday 30 November to Friday 4 December (five nights)

• A1307 eastbound between Godmanchester and St Ives
Vehicles will be diverted south on A1198, east on A428 to join the A14. Continue to Histon junction 32 and return on A14 westbound for access to A1307 at Swavesey junction 24

Monday 30 November, Wednesday 2 and Friday 4 December (three nights)

• Hinchingbrooke Park Road loop
Vehicles will be diverted via the temporary right turn onto Brampton Road

Tuesday 1, Thursday 3 and Saturday 5 December (three nights)

• Hinchingbrooke Park Road between the loop and Brampton Road
Vehicles will be diverted via Hinchingbrooke Park Road loop onto B1514 Brampton Road. Access to Huntingdon will be via A141 to Spittals and onto Ermine Street B1044

Saturday 5 (one night)

• A14 eastbound between Godmanchester/A1198 junction 23 and Swavesey junction 24
Vehicles will be diverted south on A1198 and east on A428 to re-join the A14 at Girton junction 31. Local traffic will travel north on A1198 to join the A1307
• A14 westbound between Swavesey junction 24b and Godmanchester/A1198 junction 23
Vehicles will be diverted onto A1307 to Godmanchester and south on A1198 to re-join the A14 at junction 23

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

November A14 C2H update – Bar Hill junction

Dear All

Firstly, we apologise for the slight delay in issuing you with an update on our work at Bar Hill, as was promised in our previous notice.

Further to the recent inspections, we are writing to inform you of the brief return of temporary traffic management around the Bar Hill junction. Overnight on Sunday 15 November, lane closures will be put in place on the outer lane of the junction gyratory and the B1050 between Tesco and Longstanton for approximately one week. This will include a closure of lane 1 of the junction 25 westbound exit slip.

The temporary traffic management will be in place so we can rectify a number of items, such as; replacing damaged kerbing, minor amendments to the central reservation on the B1050, reinstatement of verges and barrier repair that was caused by a road traffic collision. On completion of these works, the junction will be re-inspected and handed over to Cambridgeshire County Council.

We acknowledge this is probably disappointing for people to read, but with us being in a further lockdown period we hope this will cause minimal inconvenience to residents and businesses.

As soon as we receive confirmation that the work is complete, we will update you again.

Kind regards

 

A14 Cambridge to Huntingdon improvement scheme
Highways England | Woodlands | Manton Lane | Bedford | MK41 7LW
Web: http://www.highwaysengland.co.uk

A1307 Godmanchester to Fenstanton resurfacing

We are posting to inform you that Highways England will be carrying out essential road resurfacing works on the A1307 in both directions between the above locations.

They plan to complete this work for five weeks from Monday 16 November to Wednesday 16 December, on weeknights only, working between the hours of 8pm to 6am, subject to weather conditions.

Due to works taking place both eastbound and westbound, their works have been split into three phases which are detailed below.

Phase 1: A1307 eastbound Pathfinder Link Road to Godmanchester, starting Monday 16 November to Wednesday 25 November (10 nights)

• Eastbound traffic travelling from Pathfinder Link Road will be diverted via, B1514/ Walden Road, Ermine Street /B1044, A141 to Brampton Hut Interchange, before joining the A1 southbound to join the A14 eastbound. Leave the A14 eastbound at junction 23 to travel on the A1198 into Godmanchester.

Phase 2: A1307 eastbound Godmanchester to St Ives, starting Monday 23 November to Saturday 12 December (2 weeks)

• Eastbound traffic will be diverted off the A1307 onto the A1198, then A428 eastbound before rejoining the A14 at Girton.

Phase 3: A1307 westbound from St Ives to Godmanchester, starting Monday 14 December to Tuesday 16 December (2 nights)

• Westbound traffic will be diverted from the St Ives Roundabout via Cambridge Road towards Cambridge Services, to then join the A14 westbound. Follow the A14 westbound before merging onto the A1 towards the Brampton Hut Interchange, at the interchange take the A1 southbound exit before rejoining the A14 eastbound until junction 23 and follow the A1198 to re-join the A1307.

 

A14 C2H – Planned road closures w/c 2 November

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Monday 2 to Wednesday 4 (three nights)
• Princes Street, Huntingdon

Monday 2 to Tuesday 3 (two nights)
• A14 westbound Swavesey junction 24 to New Ellington junction 21
Vehicles will be diverted onto the A1307 westbound, south on A1198 at Godmanchester, west on A428 and north on the A1 to Brampton Hut roundabout where they can re-join the A14 at junction 21

Wednesday 4 (one night)
• A1 southbound between Brampton Interchange junction 22 and Brampton village exit slip
Vehicles will be diverted via A14 eastbound to Godmanchester junction 23, south on A1198 and west on A428 to re-join the A1 at Wyboston
• A1307 westbound between Buckingway roundabout and Swavesey north roundabout
Vehicles will be diverted east on A1307 to Bar Hill junction 25 and onto the A14 westbound to exit at Swavesey junction 24b

Saturday 7 (one night)
• A1 northbound between Buckden roundabout and A1(M) junction 14
Vehicles will be diverted onto A428 eastbound at Wyboston, north on A1198, join the A14 westbound at Godmanchester junction 23, exit at Ellington junction 20, turn right over the bridge to join the A14 eastbound. Exit to Brampton Hut, A141 to Spittals and then A1307 spur to re-join the A1M at junction 14

Sunday 8 (one night)
• A1(M) southbound between junction 14 and Brampton Hut roundabout
Vehicles will be diverted onto A1307 spur to Spittals roundabout and then west on A141 to re-join the A1 or to join the A14 at Brampton Hut roundabout

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 26 October

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements
We are currently carrying out finishing works for which we need to close lanes  or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures
Monday 26 9.30am to 3.30pm
• A1307 between Buckingway roundabout, Swavesey and Bar Hill/B1050 junction
Traffic will be diverted to use the A14 between Swavesey junction 24 and Bar Hill junction 25. Access to Lolworth and businesses within the closure will be via escort from Buckingway roundabout

Monday 26 (one night)
Contingency closure Tuesday 27 (one night)
• A14 westbound Six Mile Bottom junction 36 to Girton junction 31
Vehicles will be diverted via A11 southbound, A505 westbound and M11 northbound to re-join the A14

Tuesday 27 (one night)
Contingency closure Wednesday 28 (one night)
• A428 eastbound Madingley to A14 eastbound Milton junction 33
Vehicles will be diverted via A1303 eastbound, M11 southbound, A505 eastbound and A11 northbound to re-join the A14 at junction 36. Non-motorway traffic will be diverted through Cambridge

Wednesday 28 (one night)
• A1307 eastbound between Fenstanton and Buckingway roundabout, Swavesey
Vehicles will be diverted west on A1307 to Godmanchester, A1198 southbound and then east on the A428 at Caxton Gibbet

Wednesday 28 (one night)
Contingency closure Thursday 29 (one night)
• M11 northbound junction 13 to A14 westbound Swavesey junction 24b
Vehicles will be diverted via A1303 westbound to the A428 and northbound on A1198 at Caxton Gibbet to re-join the A14 westbound at Godmanchester junction 23

Thursday 29 to Friday 30 (two nights)
• A14 eastbound Godmanchester/A1198 junction 23 to Girton junction 31
Vehicles will be diverted south on the A1198 and eats on the A428 at Caxton Gibbet to re-join the A14 or to join the M11

Saturday 31 October and Sunday 1 November (two nights)
• A14 eastbound New Ellington junction 21 to Swavesey junction 24
Vehicles will be diverted to exit the A14 at New Ellington onto the A141 to Brampton Hut roundabout, south on the A1 to Wyboston and then onto the A428 eastbound to re-join the A14 at Girton junction 31
• A1 southbound to A14 eastbound Brampton Interchange junction 22
Vehicles will be dverted to continue south on the A1 to Wyboston and then onto the A428 eastbound to join the A14 at Girton junction 31

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/