A14 C2H – Planned road closures w/c 14 February 2022

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 9pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures
Tuesday 15 (one night)
• A1(M) southbound between junction 14 and A1 Alconbury southbound entry slip
Vehicles will be diverted onto the A1307(M) to Spittals roundabout and then west on the A141 to re-join the A1 at Brampton Hut or to continue west onto the A14

Saturday 19 8am to 5pm
• B1514 Brampton Road between Scholars Avenue and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514.

Vehicles on the Brampton side of the closure will follow this diversion in reverse.

Pedestrian access will be maintained via the footpath.

For more information about this scheme, visit https://nationalhighways.co.uk/our-work/a14-cambridge-to-huntingdon/

A14 C2H – Planned road closures w/c 31 January 2022

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 9pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

Full closures

Tuesday 1 to Friday 4 February (four nights)

A10 northbound between the Milton junction 33 gyratory and Butt Lane
Vehicles will be diverted east on the A14 to Newmarket junction 37, north on the A142, west on the Ely Southern Bypass and then either south on the A10 for access or re-join the A10 northbound to continue their journey

For more information about this scheme, visit https://nationalhighways.co.uk/our-work/a14-cambridge-to-huntingdon/

A14 C2H – Planned road closures w/c 24 January 2022

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 9pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Saturday 29 and Sunday 30 8am to 5pm

• B1514 Brampton Road between Scholars Avenue and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514.

Vehicles on the Brampton side of the closure will follow this diversion in reverse.

Pedestrian access will be maintained via the footpath.

For more information about this scheme, visit https://nationalhighways.co.uk/our-work/a14-cambridge-to-huntingdon/

A14 C2H – Planned road closures w/c 17 January 2022

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 9pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Saturday 22 8am to 5pm
• B1514 Brampton Road between Scholars Avenue and Edison Bell Way

Vehicles on the Huntingdon town centre side will be diverted onto the ring
road, St Peters Road to A141 west to Brampton / Brampton Racecourse
junction and into Brampton via B1514.

Vehicles on the Brampton side of the closure will follow this diversion in
reverse.

Pedestrian access will be maintained via the footpath.

For more information about this scheme, visit https://nationalhighways.co.uk/our-
work/a14-cambridge-to-huntingdon/

A14 C2H – Planned road closures w/c 6 December 2021

The planned extended closure of the B1514 Brampton Road on Sunday 5 has been delayed by one week and will now take place on Sunday 12 00:01 to 20:00. There will now be a closure on Saturday 4 between 8pm and 5am.

 Our closures of the A14 eastbound between Ellington and Brampton Interchange are ‘tagging on’ to the end of another planned closure by our Operational colleagues which will start at Thrapston junction 13.

 For the closures on the A1 northbound from Buckden roundabout, please note there will be an escort service available for those living in the properties on the A1 between Buckden roundabout and the Brampton village slip road.

 

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 9pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:
Full closures
Monday 6 9pm to 6am
A1 northbound between Buckden roundabout and A14 westbound Brampton Interchange junction 22
Vehicles will be diverted east on the A428 at Wyboston, north on the B1040 to join the A1198 and then onto the A14 westbound at Godmanchester junction 23. Vehicles can continue their journey on the A14 or exit onto the A1 at Brampton Interchange junction 22.
Brampton residents will diverted on the B1514 to the A141 Racecourse junction to access the A1 at Brampton Hut

Wednesday 8 9pm to 6am

• A14 eastbound between Ellington junction 20 and Brampton Interchange junction 22
Vehicles will be diverted to exit the A14 at Thrapston junction 13 onto the A605 to then travel south on the A1(M) to re-join the A14 at Brampton Interchange junction 22.

• A1 northbound Brampton Hut exit slip
Vehicles will be diverted to continue on the A1 northbound to Alconbury, exit and return on the southbound carriageway for access to Brampton Hut for the A14 and the A141

Saturday 11 9pm to 6am
• A1(M) southbound between junction 14 and Brampton Hut
Vehicles will be diverted onto the A1307(M), exit to Spittals and west on the A141 to re-join the A1 at Brampton Hut.

Please note, there will be an ‘up and over’ closure at Spittals for those wishing to continue into Huntingdon; all traffic will be sent off to Spittals roundabout

Sunday 12 12.01am to 8pm
• B1514 Brampton Road between the RingGo car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514.

Vehicles on the Brampton side of the closure will follow this diversion in reverse.

Sunday 12 9pm to 6am
• A1 northbound between Buckden roundabout and A14 westbound Brampton Interchange junction 22
Vehicles will be diverted east on the A428 at Wyboston, north on the B1040 to join the A1198 and then onto the A14 westbound at Godmanchester junction 23. Vehicles can continue their journey on the A14 or exit onto the A1 at Brampton Interchange junction 22.

Brampton residents will diverted on the B1514 to the A141 Racecourse junction to access the A1 at Brampton Hut

For more information about this scheme, visit https://nationalhighways.co.uk/our-work/a14-cambridge-to-huntingdon/

A14 C2H – Planned road closures w/c 8 November 2021

 

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements
We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 9pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:
Full closures

Monday 8 (one night) 9pm to 6am
• B1514 Brampton Road between the RingGo car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514.
Vehicles on the Brampton side of the closure will follow this diversion in reverse.
Pedestrian and cyclist access will remain via the footpath.

Thursday 11 and Sunday 14 (two nights) 9pm to 6am
• B1514 Brampton Road between the RingGo car park and Edison Bell Way, and Edison Bell Way (up to Aldi)

Vehicles on the Huntingdon town centre side will be diverted onto Ermine Street, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Residential access to Edison Bell Way will be maintained from the Aldi side.

Vehicles on the Brampton side of the closure will be diverted onto the A141 east, St Peters Road, Ermine Street and onto the ring road.
Pedestrian and cyclist access will remain via the footpath.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 1 November 2021

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements
We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 9pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Saturday 6 8am to 5pm
• B1514 Brampton Road between the RingGo car park and Edison Bell Way

Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514.

Vehicles on the Brampton side of the closure will follow this diversion in reverse.

Pedestrian and cyclist access will remain via the northern footpath.

Saturday 6 (7am to 6pm) and Sunday 7 (7am to 9pm)
• Grafham Road overbridge (over the A1)

Vehicles on the Brampton side will be diverted through Brampton via Park Road, to the B1514 and onto the A1 southbound to Buckden roundabout. From here the diversion will continue into Grafham via the B661 and Buckden Road to re-join Grafham Road.

Vehicles on the Grafham side of the bridge closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 18 October 2021

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 9pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures
Saturday 23 8am to 5pm
• B1514 Brampton Road between the RingGo car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514.

Vehicles on the Brampton side of the closure will follow this diversion in reverse.

Pedestrian and cyclist access will remain via the northern footpath.
For more information about this scheme, visit

https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 6 Sept 2021

Dear All

There’s no planned road closures for w/c 6 September in relation to the A14 Cambridge to Huntingdon improvement scheme.

A reminder that B1514 Brampton Road will be closed on both Saturday 4 & Sunday 5 8am to 5pm this weekend between Scholars Avenue and Edison Bell Way.

The new Views Common road opened this morning as planned and provides an alternative route to Spittals roundabout via Hinchingbrooke Park Road.

For all queries relating to the scheme, please email: [email protected]

Further updates on scheme progress can be found on our website.

We hope you have an enjoyable Bank Holiday weekend.

Kind regards

A14 Cambridge to Huntingdon improvement scheme
Highways England | Woodlands | Manton Lane | Bedford | MK41 7LW
Web: http://www.highwaysengland.co.uk

A14 C2H – Planned road closures w/c 30 Aug 2021

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements
We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.
For this week, the planned closures are:

Full closures

 Thursday 2 to Friday 3 September (two nights)
• A14 westbound Cambridge Services/Boxworth junction 24a exit slip
Vehicles will exit at junction 24b and use the access road via the first exit at the roundabout for the Services or Boxworth

Saturday 4 and Sunday 5 September 8am to 5pm
• B1514 Brampton Road between Scholars Avenue and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514.

Vehicles on the Brampton side of the closure will follow this diversion in reverse.

Please note, the new Views Common road will be open from Friday 3 September and will provide alternative access to Spittals whilst the above closure is in place.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/